Providing and Installation of 5 power lines 20 kV

Claritas est etiam processus dynamicus, qui sequitur <br>mutationem consuetudium lectorum.
Awesome Image

  • Client:
    ICRC
  • Date:
    25th jan, 2016
  • budget:
    55,881,975 SYP
  • location:
    Daraa - Syria
  • surface:
    PO REF.NO. AMB02SY DAM19/006366
  • architect:
    Anas Al Baba & Yaman Orabi

Project Goal:

Providing and Installation of 5 power lines 20 kV for boreholes in Daraa governorate Lengthes : Izraa : 534m , Tybnah : 161 m , Al Qnayyah : 217 m , Garfa : 160 m , Kamonah : 616 m

Project description:

1- #TOWERS AND CROSS-ARMS : 1.1 providing and transporting single circuit tower 13.5 m height 16000 N , 1.2 providing and transporting single circuit tower 13.5 m height 10000 N , 1.3 providing and transporting single circuit tower 13.5 m height 16000 N for the transformer , 1.4 providing and transporting normal cross-arms for tower 16000 N or 10000 N , 1.5 providing and transporting flag cross-arms for towers 10000 N , 1.6 providing and transporting single cross-arms for the first tower and the transformer tower , 2- #CONDUCTORS: 2.1 Aluminium Conductor steal reinforced 50/8 , 2.2 20 kV Aluminium XLPE 70*3+50 standed cable , 3- # ACCESSORIES: 3.1 20 kV insulator , 3.2 20 kV support insulator with all needed accessories to be installed on the tower , 3.3 Screw 3*16 with nuts EACH , 3.4 Screw 3*12 EACH 12*3 , 3.5 External End box for XLPE Cable , 3.6 Aluminium wedge for earthing 1.5 m , 3.7 Ball Eye , 3.8 U Bolt , 3.9 Tension clamp , 3.10 Suspension clamp , 4- # CIVIL WORKS , 5- TRANSFORMING CENTER